Lumberton 9.5 MW Solar Ground Mount System

Lumberton, NJ

As a new investor in the United States solar market, GD Development was looking for the top EPC contractor to complete the Lumberton Solar Project. After an exhaustive search, they chose Conti as their partner.

Conti designed and constructed two adjacent arrays interconnected at 13.2 kV totaling 9.5 MW, managing all aspects of the project, including grid interconnection, utility coordination and state, county and township approval. Conti cleared the 40-acre site and installed the over 33,000 photovoltaic (PV) modules and 12 inverter skids in the array. Special considerations were made during construction as the site contained historic grounds as well as wetlands.

Conti worked with local, county and state officials to construct the array in accordance with inspectors’ requests while meeting the difficult schedule demands of the project. The original design called for interconnection at 69 kV, however, due to schedule and constructability concerns it became clear this interconnection could not be completed in the project’s timeframe.

In response, Conti worked with utility companies PJM and PSE&G to re-engineer the interconnection voltage to 3.2 kV. Conti also worked with PJM to perform feasibility and impact studies on an accelerated basis, starting construction within months of finalizing design details and applications. This proactive redesigning allowed for on time project completion and saved the owner over $500,000.

Working with the utility to modify the interconnection voltage for the project, Conti was able to save the project owner money and complete the construction on schedule.

Project details

Client GD Development Corporation
Duration 5/2016
Key features
  • PV Modules: Auxim 285 W
  • Inverters: SIC USA Central
  • Mounting Systems: RBI Solar
  • Data Acquisition System: Locus
  • System Size: 9.5 MW

A Street 3.8 MW Ground Mount Solar Array

A Street 3.8 MW Ground Mount Solar Array

The primary solar project developer in Rhode Island, Southern Sky, contracted CS Energy to engineer, procure, and construct a 3.8 MW solar field.

Read more

West Shore Road 1.0 MW Ground Mount Solar Array

West Shore Road 1.0 MW Ground Mount Solar Array

The primary solar project developer in Rhode Island, Southern Sky, contracted CS Energy to design and construct this 1MW solar project in Warwick.

Read more

Kilvert Street 6.0 MW Ground Mount Solar Array

Kilvert Street 6.0 MW Ground Mount Solar Array

Southern Sky, the primary solar project developer in Rhode Island, contracted CS Energy to design, procure and construct a 6 MW solar array.

Read more